GE Frame 6B gas turbine gas generator

































If you decide to buy equipment at a low price, make sure that you communicate with the real seller. Find out as much information about the owner of the equipment as possible. One way of cheating is to represent yourself as a real company. In case of suspicion, inform us about this for additional control, through the feedback form.
Before you decide to make a purchase, carefully review several sales offers to understand the average cost of your chosen equipment. If the price of the offer you like is much lower than similar offers, think about it. A significant price difference may indicate hidden defects or an attempt by the seller to commit fraudulent acts.
Do not buy products which price is too different from the average price for similar equipment.
Do not give consent to dubious pledges and prepaid goods. In case of doubt, do not be afraid to clarify details, ask for additional photographs and documents for equipment, check the authenticity of documents, ask questions.
The most common type of fraud. Unfair sellers may request a certain amount of advance payment to “book” your right to purchase equipment. Thus, fraudsters can collect a large amount and disappear, no longer get in touch.
- Transfer of prepayment to the card
- Do not make an advance payment without paperwork confirming the process of transferring money, if during the communication the seller is in doubt.
- Transfer to the “Trustee” account
- Such a request should be alarming, most likely you are communicating with a fraudster.
- Transfer to a company account with a similar name
- Be careful, fraudsters may disguise themselves as well-known companies, making minor changes to the name. Do not transfer funds if the company name is in doubt.
- Substitution of own details in the invoice of a real company
- Before making a transfer, make sure that the specified details are correct, and whether they relate to the specified company.
Seller's contacts










2x GE Frame 6B gas turbines
### Technical Summary
#### Equipment Details
**Gas Turbines**: Two GE MS 6001 B gas turbines paired with AEG generators (Type S7102/2)
**Operation History**
**Commissioning**: 1981
**Gas-fired Operation**: Until 2005
primarily for base load (~7000 hours/year)
**Operational Hours in Combined Cycle**
GT21: ~167,000 hours
~1130 starts
GT22: ~159,000 hours
~1180 starts
**Retrofitted**: In 1996 with water injection for NOx reduction
**Conversion**: In 2007 to peak load operation using heating oil (HEL) with new steel chimneys and upgraded control systems to ABB Procontrol 14
**Operational Hours in Peak Load**
GT21: ~130 hours
~177 starts
GT22: ~150 hours
~180 starts
**Last Network Operation**: 2015
**Last Oil Service**
GT21: October 2015
GT22: September 2016
**Last Borescope Inspection**: December 2016
**Defect**: Heating oil transfer line issue in 2017 halted operations
**Decommissioning**: September 2023
#### Technical Specifications
**Application**: Generator drive
**Shaft Speed**: 5105 rpm
**Control System**: ABB Procontrol 14
**Protection Systems**: Overspeed
overtemperature
vibration
and flame monitoring
**Cooling Mechanism**: Integrated rotation device in the torque converter
#### Environmental Conditions
**Ambient Temperature**: 15°C
**Air Pressure**: 0.9945 bar
**Pressure Drop in Intake System**: 10.0 mbar
**Exhaust Diffuser Outlet Pressure**: 30.0 mbar
**Relative Humidity**: 60%
#### Compressor Section
**Stages**: 17 axial stages
**Type**: High-performance axial compressor
**Casing**: Horizontally split
**Inlet Guide Vanes**: Adjustable
#### Turbine Section
**Stages**: 3 continuous shaft stages
**Casing**: Horizontally split
**Guide Vanes**: Fixed
#### Combustion System
**Type**: 10 concentric ring chambers around the compressor
**Fuel Nozzles**: One per chamber
pressure atomized
**Ignition**: 2 spring-loaded
self-retracting electrode-type spark plugs
**Flame Monitors**: 2 ultraviolet
#### Bearing Arrangement
**Number**: 2
**Lubrication**
**Bearing No. 1**: Pressure lubricated
combination of thrust and journal bearings
**Bearing No. 2**: Lemon bore journal bearing
#### Starting System
**Device**: Diesel engine (12 V-71-NT turbocharger)
**Torque Converter**: Hydraulic with integrated reversing gear and rotation device
#### Fuel System
**Operating Fuel**: Heating oil (HEL)
**Fuel Pump**: Auxiliary gear-driven screw pump with constant flow
**Fuel Distributor**: Free-rotating
10 elements
**Fuel Shutoff Valve**: Electrohydraulic servo control
**Fuel Filters**: 2 low-pressure full-flow
1 high-pressure full-flow
#### Lubrication System
**Lubricant**: Petroleum-based
**Total Volume**: ~7000 liters
**Main Oil Pump**: Shaft-driven
flange-mounted to auxiliary gearbox
**Auxiliary and Emergency Oil Pumps**: Motor-driven submersible centrifugal pumps
#### Heat Exchanger
**Type**: Oil/Water
**Quantity**: Single unit
#### Lubrication Filters
**Type**: Full-flow with changeover valve
**Quantity**: 2
**Filter Type**: 5-micron
#### Hydraulic System
**Pump**: Gear-driven axial piston pump
**Filters**: 2 full-flow with changeover valve
#### Cooling System
**Pump**: Gear-driven centrifugal pump
#### Atomization Air System
**Main Compressor**: Gear-driven centrifugal compressor
**Starting Compressor**: Positive displacement pump driven by starting diesel
**Pre-cooler**: Tubular and air/water heat exchanger
**Air Filter**: Centrifugal separator
#### Performance Data
**Output at Generator Terminals (Heating Oil)**: Base load 33.75 MW
**Efficiency**: 29.9%
**Exhaust Mass Flow**: ~131.3 kg/s
**Exhaust Temperature**: ~530°C
The spare parts are
compressor and turbine blading
used (various) and revised (leading row 2 + 3 and running row 1 + 2)
Transition pieces used and revised
Flammrohre used and revised
Fuel nozzles and much more
Cover segments (new)
As well as a complete warehouse with small parts (hydraulic components
screw connections
seals
measurement technology
etc.)
Find more here
show contacts
Contact us at
show contacts