Biomass Power Plant 5 MW other alternative energy source









If you decide to buy equipment at a low price, make sure that you communicate with the real seller. Find out as much information about the owner of the equipment as possible. One way of cheating is to represent yourself as a real company. In case of suspicion, inform us about this for additional control, through the feedback form.
Before you decide to make a purchase, carefully review several sales offers to understand the average cost of your chosen equipment. If the price of the offer you like is much lower than similar offers, think about it. A significant price difference may indicate hidden defects or an attempt by the seller to commit fraudulent acts.
Do not buy products which price is too different from the average price for similar equipment.
Do not give consent to dubious pledges and prepaid goods. In case of doubt, do not be afraid to clarify details, ask for additional photographs and documents for equipment, check the authenticity of documents, ask questions.
The most common type of fraud. Unfair sellers may request a certain amount of advance payment to “book” your right to purchase equipment. Thus, fraudsters can collect a large amount and disappear, no longer get in touch.
- Transfer of prepayment to the card
- Do not make an advance payment without paperwork confirming the process of transferring money, if during the communication the seller is in doubt.
- Transfer to the “Trustee” account
- Such a request should be alarming, most likely you are communicating with a fraudster.
- Transfer to a company account with a similar name
- Be careful, fraudsters may disguise themselves as well-known companies, making minor changes to the name. Do not transfer funds if the company name is in doubt.
- Substitution of own details in the invoice of a real company
- Before making a transfer, make sure that the specified details are correct, and whether they relate to the specified company.
Seller's contacts



Marke: Biomass Power Plant 5 MW
Combined heat and power plant consisting of 3 steam boilers
Bfsbv2vj28e
Commissioning in 2008/2009
Expansion with 3rd boiler in 2010
All three boilers are identical
Each boiler 13 tons of steam/h~
12.5 MWh BWL Fuel heat output
26 bar operating pressure / 32 bar safety valve 480°C
MAN turbine
Exhaust gas pressure 0.8-1.4 bara
Heat extraction flow at heating condenser 90-105°C
4.93 MW (electrical) at 90°C flow rate
Generator: 6.3kV